Waikato Te KauwhataNon-certified, eHaus Euro, Passive House Plus

Discover

Set in the rolling hills of the Waikato this beautiful off the grid family home ticks all of the boxes. After significant research and gaining confidence from a friend that had built an off the grid eHaus in Manawatu, the owners made the decision to go for it and engaged the eHaus Waikato team.  The clever design of the system means the owner is able to continue with his hobbies which incredibly includes welding which the system copes without any issues. These owners are living the dream in this amazing high performing home generating its own power.

1,227

This project is making significant carbon savings for a better environment.

We believe that our homes should have a big impact on the way we live, but little impact on the land. We've calculated the amount of carbon our homes have saved through energy efficiency from move in day 'til now. At their core, eHaus' are built with the elimination of carbon emissions in mind - so we're not only creating healthy, comfy & high performing homes, but spaces that don't cost the earth.

Learn More

Meet the team of designers and builders behind this project

Our eHaus team is made up of some of the country's best Passive House builders, architects and designers who are redefining the way kiwis live one home at a time. Our team of professionals work together to see your dreams come to reality.
Experience
See this eHaus for yourself
Contact us

Design Components

Floor
Fully insulated concrete pad with a U-value of 0.182 W/(m²K)
Wall
140mm timber frame with service cavity U-value of 0.223 W/(m²K)
Window Joinery Frame
eco Windows laminated timber with aluminium outer facade (Wood Alu) Uf value 1.2 W/(m²K)
Glazing
Double Glazed Low E Argon Ug value 1.12 W/(m²K) G Value 61%
Ventilation
Zehnder ComfoAir Q350 MHRV
Heating/Cooling
Ceiling mounted 7.8kW Heat pump, Wall mounted 3.2kW Heat pump, 3kW Flame effect electric fire
Hot Water
Reclaim Co² 300L Heat pump

Performance Specs

Heating Demand: 7.7 kWh/m²/yr
Heating Load: 9.2 W/m²
Frequency of Overheating: 2.6% year over 25C
TFA: 212.8 m²
Form Factor: 3.53
Air Leakage@50Pa: 0.5ACH

Consultant

Maria Rei

Certifier

Non certified

We've picked out a few of our other projects you might like

View all projects
Ready to start your eHaus journey?
eHaus
400 Victoria Ave, Whanganui
We believe all great projects start with a great conversation. Get in touch with us to get your eHaus project started with a free, no obligation consultation.
Book a free consultation
© ECOBUILD DEVELOPMENTS 2019 - 2021